Repair works are continuing on the lighting system at the Causeway Bridge, and motorists should expect a one-lane closure during evening hours.
Port St. Maarten Group says the closure will be in effect Monday to Friday, from 11 PM to 5 AM, starting Tuesday night, May 5th.
The maintenance is part of ongoing efforts to improve the bridge’s function, safety, visibility, and overall appearance, especially at night along the Simpson Bay Lagoon corridor.
A lift system has been placed on the bridge to assist crews with the repair works. Maintenance teams will be working at different points along the structure over the coming months.
Pedestrians are being asked to use caution when crossing the bridge and to keep a safe distance from the lift equipment and work crews. The public is also warned not to tamper with any equipment, as this could create serious safety risks for workers operating the lift.
Port St. Maarten Group is thanking the public for its cooperation while the lighting repairs are completed.
← News Archive